CensatimCENSATIM← All sample reports
PartialAsset assessment · Full Alignment

BioKraft Anlage Emsland, Germany

BioKraft is a fictional anaerobic digestion plant processing 60,000 tonnes of separately collected bio-waste a year, with quarterly methane leak detection and certified digestate. During the assessment the operator confirms no climate risk and vulnerability assessment has ever been carried out for the site.

A fictional subject, created to demonstrate the assessment. The reports below are the tool’s unedited output.

What to notice in this example

The substantial contribution is earned: separately collected feedstock, methane leakage control and digestate use are each evidenced and rated.

The confirmed absence of a climate risk assessment is rated Not aligned on the adaptation objective: absence confirmed is a finding, and the report treats it as one.

Partial is the honest overall: contribution met, one objective failed, and the summary table shows exactly that shape rather than rounding it in either direction.

The gap register turns the failure into a work list: what a compliant climate risk assessment covers, so the operator knows precisely what closing it requires.

2 · Full alignment report

The paid stage: criterion-by-criterion findings, confidence, gaps, and annexes.

Open full PDF →

Preview not loading on your device? Open the PDF directly.

Run the same assessment on your own asset: eligibility is free and takes under a minute.

Start your free eligibility check →