Borealis DC-2, Finland

Borealis DC-2 is a fictional 12 MW colocation data centre near Espoo, evaluated by an infrastructure fund ahead of acquisition. No documents were uploaded: the respondent answered from deal-team knowledge, and confirmed during the dialogue that no site water management plan exists.

A fictional subject, created to demonstrate the assessment. The reports below are the tool’s unedited output.

What to notice in this example

With no uploads, the report opens with the good-faith basis statement: findings rest on the recorded rounds of questioning, taken at face value, with the full record in Annex B.

The confirmed absence of the water management plan is rated Not aligned at High confidence, not left undetermined: the assessment reflects the current state, and the gap register says what closing it looks like.

The Code of Conduct verification was clearly attested but sits in the data room, so that finding is In-line at Moderate: the rating follows the evidence, the confidence carries the caveat.

The overall verdict reads Partial under the gateway rule: Substantial Contribution is met, one DNSH objective falls short.

1 · Free eligibility report

The free stage: activity identification, eligibility, and preparation guidance.

Open full PDF →

Preview not loading on your device? Open the PDF directly.

2 · Full alignment report

The paid stage: criterion-by-criterion findings, confidence, gaps, and annexes.

Open full PDF →

Preview not loading on your device? Open the PDF directly.

Run the same assessment on your own asset: eligibility is free and takes under a minute.