Iberia DC-1, Spain

Iberia DC-1 is a fictional 12 MW colocation data centre near Zaragoza, in a region classified as high baseline water stress, cooled evaporatively. During the assessment the operator confirms that no water use and protection management plan exists and none has been produced.

A fictional subject, created to demonstrate the assessment. The reports below are the tool’s unedited output.

What to notice in this example

A confirmed absence is a finding, not a gap: the missing water plan in a water-stressed location is rated Not aligned at High confidence, with the report explaining why the location makes it decisive.

One failing objective is enough: the report states plainly that DNSH is only met when every applicable objective is met, and shows which objective drives the verdict.

The partially implemented Code of Conduct practices are handled honestly: partial implementation with a pending gap review is not verification, and the rating says so.

The remediation picture is constructive: the gap register describes what closing the water plan gap looks like, so a failed report is still a useful one.

2 · Full alignment report

The paid stage: criterion-by-criterion findings, confidence, gaps, and annexes.

Open full PDF →

Preview not loading on your device? Open the PDF directly.

Run the same assessment on your own asset: eligibility is free and takes under a minute.